Results 1 to 2 of 2

Thread: Saturn 1B AS-211 at the Alabama Welcome Center discussion

  1. #1
    ṨῤἵḋểṙẊƻƻ SpiderX22's Avatar
    Join Date
    Feb 2006
    Location
    Massachusetts
    Posts
    3,914

    Default Saturn 1B AS-211 at the Alabama Welcome Center discussion

    This is a discussion thread for the following file:

    Saturn 1B AS-211 at the Alabama Welcome Center

    First stage on display with the S-IVB Battleship Test Stage stacked in a launch ready condition at the Alabama Welcome Center on I-65 in Ardmore, AL.



    The Saturn IB was an uprated version of the Saturn I, which featured a much more powerful second stage, the S-IVB. Unlike the earlier Saturn I, the IB had enough throw weight to launch the Apollo Command/Service Module or Lunar Module into Earth orbit, which made it invaluable for testing the Apollo spacecraft while the larger Saturn V needed to send them to the moon was still being developed. The Saturn IB was later used for manned Skylab flights, and the Apollo-Soyuz Test Project. The final production run (such as Skylab launch vehicles) did not have the alternating black and white tanks on the first stage that were hallmarks of the earlier runs.


  2. #2
    ṨῤἵḋểṙẊƻƻ SpiderX22's Avatar
    Join Date
    Feb 2006
    Location
    Massachusetts
    Posts
    3,914
    ٩(̾●̮̮̃̾Ľ̃̾)۶

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •